You must log in or # to comment.
Should have billed Bezos for it
I remember watching a show about these, some years back. Didn’t know they were called MOSE. IIRC, Italian and local bureaucracy slowed the project way down, unfortunately. I suppose if they built these on the original timeline, Venice would have had a lot more leeway here, but now they’re right up against it.
Pretty much every scientific prediction I know of about rising sea levels and global warming has been on the cautious side, not fully taking in to acct additional factors such as various tipping points, from which there is no known or anticipated recovery.




